Description Of The Project Of Ministry Of Civil Aviation And Tourism


Detail Description Of The Project
14.0 Information Is Related To The Introduction Of The Project-
14.1 Description Of Circumstance With Problems-
For the purpose of create regional hub in the aviation sector and bridge in between eastern and western of Bangladesh through Bangladesh Civil Aviation Authority (Bebichak) the development work to make modern airports in the country respectively is going on. Cox's Bazaar Airport is one of the main internal airport of Bangladesh and at present in this airport daily 10 passenger carrier and 4 cargo air is landing on average. To have evaluation of tourist industry of the country for having commute benefits to the tourists with tourist city Cox's Bazaar and in between Dhaka and main cities to establish communication facilities Honorable Prime Minister of the Government of The People's Republic of Bangladesh as has promised as the priority project for the purpose to develop international standard airport to have commute of airlines to the Cox's Bazaar airport a project is in continued which is in titled "Cox's Bazaar Airport Development Project (1st Stage)". Under this project the existing runway capacity to be developed, setting up airfield lighting system, fire fighting vehicle to be purchased, communication machines such as ILS, VOR- BME etc to be set up including accomplishment of related works and a fire fighting vehicle is getting purchased. Under this airport related almost all of the activities are near to be accomplished.
Last dated 06/05/2017 AD Honorable Prime Minister of the Government of People's Republic of Bangladesh the up- down of B-737-800 airlines in the airport has inaugurated. In the mentioned inauguration program she has given oral instruction in the discussion to develop the length of runway in 12000 feet for the operation international flights including making sure full loaded expanded air commute in the air port. In addition, last dated 22/11/2016 AD in the prime minister office in presence of honorable prime minister under the Bangladesh Civil Aviation Authority beside Cox's Bazaar Airport Development Project (1st Stage) under implementation of Cox's Bazaar airport runway expansion project (2nd Stage) and radar set up etc regarding the project regarding the subject a brief discussion meeting was hold. In the meeting honorable prime minister at the time of discussion on the expansion work of Cox's Bazaar airport runway in the shown place of map to remove the mountain land as shown she has given oral instruction to take necessary steps.
Beside the implementation of the project titled "Cox's Bazaar Airport Development (1st Stage)" for the purpose of for the purpose of operation international flights directly from Cox's Bazaar airport by the expenditure of 275.00 crore taka in the own fund of CAAB of the international passenger terminal with all of the benefits the construction works of a terminal building is in continuous. Under this project connecting taxiway, expanded aircraft parking facilities such as apron etc construction including international flight operation for passenger handling all of the facilities such as- boarding bridge, escalator, baggage handling system, central air condition system, PA system, FIDS, baggage scanning machine etc will be constructed as well.
As per above mentioned circumstance, for the purpose to make sure up and down of national air in full loaded of big air meaning B-777-300ER, B-747-400 in the runway of Cox's Bazaar airport to the CAAB Maheshkhali channel in reclamation process to expand more 3000 feet runway statistics, pavement, Airfield Lighting System, Geometric and structural and Morphological studies, preservation wall design, for its drawing CAAB is appointed to the Institute of Water Modeling, Dutch Hydraulic Institute and Royal Haskoning Netherland. Their constructed summary of the detail statistics are attached therefore.  
Page No- 2
Based on the document construction, drawing and detail design from BRTC, BUET and IWM including foreign organization to the Maheshkhali channel for expanding more 3000 feet runway CAAb has taken the above mentioned project. Beside to expand the runway through dredging of coastal surface of Maheshjhali channel to keep preserved the renewal by removing to the water resource ministry air transportation and tour ministry in memorandum no- 30.018.07.00.007.2014(part-2)/10 on dated 02/01/2017 AD to the sea transportation ministry in air transportation and tour ministry in memorandum no- 30.018.014.05.00.005.2012(part)-04 on dated 03/01/2017 AD has been informed (attachment no- J)
There is to be mentioned that, Under the project titled "Cox's Bazaar Airport Development Project (1st Stage)" a fire fighting vehicle is getting purchased and as per aero drum emergency plan of ICAO for the development aero drum category in the discussed project more 2 (two) fire fighting vehicles will be purchased (attachment no- L).
In that situation, to make sure the subject of full loaded expanded air up and down in t runway of Cox's Bazaar airport including for the purpose to develop 12000 feet long runway the features will be constructed under the above mentioned project as mentioned in below-
A) Runway of airport will be increased from 9000 feet to 12000 feet.
B) Lighting system of precision approach cat- 1 will be constructed.
C) The big airs will be able to up and down in full loaded.
D) The passenger capacity of the airport will be increased.
E) The number of flight operation in the airport will be increased.
F) The capacity of international cargo transportation will be increased.
As per received statistics based on the estimated expenditure of 379271.10 lakhs taka by the complete government finance for implementation the project titled "Cox's Bazaar Airport Runway Expansion (2nd Stage)" for approval of the government in DPP last dated 30/08/2018 AD is sent to the Administration Ministry. On the sent DPP last dated 10/09/2018 AD a meeting was hold of the project verification committee presiding by the secretary in charge of ministry (attachment no- P). The detail discussion was holding on the proposed DPP in the meeting.
As per the decision of the above mentioned meeting based the expenditure of total 379333.33 lakhs taka the re constructed DPP of the mentioned project for the purpose of approval of the government is sent to the planning commission.
On the sent DPP, regarding the mentioned project member of infrastructure department of planning commission Mr Shudhir Kishor Chowdhury was presided a project evaluation committee (PEC) last dated 25/10/2-18 AD. In the mentioned meeting detail discussion on DPP was hold.
As per decision of the above mentioned meeting based on the expenditure of of 370960.84 lakhs taka of the project titled "Cox's Bazaar Airport Runway Expansion" of its re constructed DPP gas been prepared to get approval of the government.
There is to be mentioned that, the project has been taken under the national planning of the government (attachment no- Q).
14.2 Relation With Other Project/ Organization-
The above mentioned project is directly related with the project titled "Cox's Bazaar Airport International Passenger Terminal Building Construction" and "Cox's Airport Development (Stage- 1)".
14.3 Poverty Situation-
After the accomplishment of the above mentioned project the facilities will be created to operate full loaded expanded international flights directly from Cox's Bazaar. As a result from this airport beside general passenger international tourist movement will increase. As a result beside the foreign investment income in the tourist sector flow will increase which will increase GDP of the country and will keep role to decrease the poverty indirectly.
15.0 Description Of The Project-
15.1 Purpose- Operating full loaded expanded directly from Cox's Bazaar.
15.2 Results Of The Project- Operating international flights from Cox's Bazaar and creating full loaded expanded airs operation benefits.
15.3 Output Of The Project-
·         3000 Fee runway in the edge of 17 runway will be constructed.
·         Precision approach cat- 1 lighting system will be constructed. 

Page No- 3
Government Of The People's Republic Of Bangladesh
Planning Commission
Infrastructure Department
Rail Transportation Wing
Activity Resolution Of The PEC
The PEC meeting was hold last dated 25/10/2018 AD on the project titled "Cox's Bazaar Airport Runway Expansion (2nd Stage)" proposed by the Civil Aviation And Tour Ministry presided by Mr Shibir Kishor Chowdhury, Member, Planning Commission Infrastructure Department. The list of present officers in the meeting is attached in the attachment no- 'A'.
02. Presentation-
The president has started meeting by giving greetings to all who were presented. and joint- secretary (Rail) was called for to provide presentation on the above mentioned subject. Joint- secretary has informed to the meeting (Rail) on that, for the purpose to develop international standard airport which is appropriate for expanded aviation in Cox's Bazaar airport a project is in continuous titled "Cox's Bazaar Airport Development Project (1st Stage)". Under the project to develop the existing runway length from 6775 feet to 9000 feet and width 120 feet to 200 feet, increasing capacity of runway, construction of airfield lighting system, fire fighting and vehicle purchase, communication machine such as ILS, Vdeo r- DME etc construction including other related works have been accomplished. In the Cox's Bazaar airport runway full loaded expanded air meaning V- 777- 3000 ER and B- 747-400 types of air of the purpose to have up and down based possibility statistics the mentioned project was proposed for expansion of more 3000 feet runway to Maheshkhali channel. The project is completely by the finance of GOB in total expenditure of 3793.33 crore taka is proposed to be implemented from January, 2019 AD to December, 2021.
03 Discussion-
3.1 Regarding the logic to take the project as has wanted to know the representative of Civil Aviation Authority (Bechik) has informed to the meeting on that, there have 8 airports in Bangladesh (3 international + 5 domestic airports). Among them Cox's Bazaar airport is one of the main domestic airport of the country. To construct the airport international standard and more modern airport and for the purpose to up and down of the expanded types of airs such as B- 777-300 and B-747-4000 the present runway          
Page No- 4
For the purpose to have expanded from 9000 feet to 12000 feet the above mentioned project has been taken. In that case most of the part of the expanded share to the ocean will be accomplished through filling up soil. He has presented detail sketch map of the project in the meeting and the activities are discussed in the meeting.
3.2 In the meeting as has wanted to know whether has accomplished any feasibility study in the mentioned project the chief engineer of Bechik has informed that, in supports of consultants of Netherlands IWM and BRTC, (BUET) the feasibility study of the mentioned project and construction of detail design have been constructed. As per the above mentioned design the detail activities of the project have been included.
3.3 Chief of the department has told on that, under the project the subject wise qualification, experience and salary and allowance to have mentioned of the consultants will have to be mentioned in complete ToR DPP. In the meeting on the proposal, all have become agreed. The discussion was made in the meeting on that, to specify the price of the soil, to make sure the implementation of the project, a gang chart and the reasons to purchase fire lighting vehicles will be needed to be mentioned in DPP. In addition, divide of expenditure of air field ground lighting sectors (Runway, restriction wall and wall preservation activities etc) and the picture of cross section infrastructure activities will have to be mentioned in DPP regarding that all have become agreed in DPP.
3.4 The representative of IME has informed on that, mentioning the measurable indicator of the project appropriate in Logframe DPP is needed to be mentioned. In addition name of the project removing "second stage" from its part only the title of the project "Cox's Bazaar Airport Runway Expansion" is needed to be named. He has told more on that, as per ruling letter of the development project specifying physical contingency and price contingency and specifying steering committee and implementation committee is needed to be constructed. The president has given instruction to comply the above mentioned consultants. More has been told in the meeting on that, in equal previous any project construction works as the mentioned project for the purpose to not have any conflicts regarding that subject from the related ministry measurement of the part of the project and expenditure is needed to be specified and with the 1st level of the project as there has no any conflict regarding that a certificate is needed to be attached with DPP.
04 Decisions-
After the detail discussion to approve the project has been recommended as per following the decisions as mentioned in below-
4.1 The title of the project will have to be specified "Cox's Bazaar Airport Runway Expansion";
4.2 The consultants of the project of their subject wise qualification, experience, salary and allowance with description in details will have be included in ToR DPP;
Page No- 5
4.3 The base of soil price of the project will have be mentioned in DPP;
4.4 Within the planned time to make sure the implementation of the project a gang charts is attached in DPP;
4.5 In the Cox's Bazaar Airport Development Project (1st Stage) firing light vehicles have been purchased so in the proposed project to keep in reservation of these types of vehicles of its reasons will have to be mentioned in DPP;
4.6 The detail expenditure of Air Field Grand Lighting will have to be mentioned in partition DPP;
4.7 Cros section images of infrastructure construction works will have to be mentioned in DPP;
4.8 Appropriate Logframe including the description of Measurable Indicators will have to be provided in DPP;
4.9 As for Physical and price contingency the total estimated expenditure of the project will have to reserved of 1.5% and 4%.
4.10 As per ruling letter of the development project steering committee and implementation committee will have to be constructed.
4.11 The measurement and expenditure based on the parts of the project are correct and with the 1st stage of the project no conflicts are existed regarding that a certificate will have to be attached in DPP;
4.12 Complying the above mentioned decisions the reconstruction of DPP will have to be sent soon to the planning commission.
5.0 In the end president as thanking to all in present the meeting has declared to be ended.
Sd/ Illegible
Date- 18/12/2018 AD
(Shubir Kishor Chowdhury)
Member
Infrastructure Construction Department
Planning Commission


Page No- 1
Government Of The People's Republic Of Bangladesh
Ministry Of Civil Aviation And Tourism
Planning- 1 Branch
www.mocat.gov.bd
"Cox's Bazaar Airport Runway Expansion (2nd Stage)" Titled Project Of Its Hold Meeting Resolution of The Evaluation Committee.
President- Md. Mahibul Haque
In Charge Secretary
Civil Aviation Transportation And Tour Ministry
date- 10/09/2018 AD
Time- 2.30 PM
Location- Conference Room Of The Ministry.
List of the present officers in the meeting has been attached in the attachment no- A.
02. Discussion-
In the beginning of the meeting the president has started the activity of the meeting giving greetings to all who are present. The meeting has been informed on that, for the increasing operational benefits including making sure up and down of the full loaded expanded airs in the Cox's Bazaar airport the project titled "Cox's Bazaar Airport Runway Expansion (2nd Stage)". The estimated expenditure of this project is 379271.10 (three thousands seven hundred ninety two crore seventy one lakhs ten thousands) taka and the time period has been specified January, 2019 AD June, 2021 AD.
2.2 Under this project the constructed benefits are- from the runway of the airport of 9000 feet to 12000 feet to be developed, prescription approach cat- 1 lighting system establishment, drainage system construction, preservation work of restriction wall, construction of road on the asylum taken restriction area, boundary wall and security fencing etc. There is to be mentioned that, Honorable Prime Minister promised as the priority project for the purpose to develop use appropriate international standard airport to have expanded air commute in the Cox's Bazaar airport a project is in continuous which is titled "Cox's Bazaar Airport Development Project (1st Stage)". Under the project to develop the existing runway of its length from 6775 feet to 9000 feet and width from 120 feet to 200 feet, increasing capacity of the runway, airfield lighting system construction, fire lighting vehicle purchasing, communication machines such as ILS, DVOR- DME etc construction including construction of the related works is getting accomplished. Under this project airport related almost all of the activities are near to be accomplished.
2.3 The meeting has been informed on that, the expenditure of the project as per PWD rate schedule 2018 has been projected. The president as has wanted to know about any problems regarding the land of the project the representative of Bechik has informed on that, the project mainly to the Maheshkhali channel will be implemented so there has no any problems regarding lands. The time duration to implement the project to have been specified regarding that in the meeting has been discussed. In that situation president has given consultation to specify the validity of the project period from January, 2019 to December, 2021 AD. Bechik chairman under this project fire lighting vehicle inclusive is needed regarding as has mentioned the subject president has become agreed.
03. After The Detail Discussion The Decisions Have Been Taken As Mentioned In Below-
A) The time duration of the project has been specified from January, 2019 AD to December, 2021 AD.
B) Fire lighting vehicle will have to be included in the project DPP.
C) The information related to DPP certification and MTBF will have to be included.
D) As per above mentioned decisions the re construction DPP will have to be sent urgent to the ministry.
04. Then as there has no more discussion the president by giving thanks to all in present has declared the meeting to be ended.
Signature/-
Date- 11/09/2018 AD
(Md. Mahinurl Haque)
In Charge Secretary
Civil Aviation Transportation And Tour Ministry          


Page No- 2
Government Of The People's Republic Of Bangladesh
Ministry Of Civil Aviation And Tourism
Planning- 1 Branch
www.mocat.gov.bd
No- 30.018.014.05.00.005.2012 (part)-04                                          Date- 03/01/2017 AD
Subject- Regarding To Remove Land Which Has Shown In The Edge Of Maheshkhali Channel In Maheshkhali.
Reference No- 42.034.031.00.00.001.2012-636, Date- 07/12/2017 AD.
As per above mentioned subject and reference there is informing on that, for the purpose to expand and develop in international of Cox's Bazaar airport the project has been taken in titled "Cox's Bazaar Airport Development (1st Stage)- (2nd Amended)" by the Bangladesh Civil Aviation Authority. To implement the project the damaged landless families to have rehabilitation beside Cox' Bazaar district Sadar upazilla in Bakkhali river and Maheshkhali channel in Kharuschool mouza in asylum no- 2 the project is getting implemented. Under the project beside Maheshkhali coastal area and in the coastal areas Bashkhali river with sloop protection construction of restriction wall, canal reconstruction, construction of regulator and filling up soil with land development other activities ar getting implemented by Bangladesh Water Development Board.
02. Last dated 22/11/2016 AD in presence of the Honorable prime Minister in the Prime Minister Office under the Civil Aviation Authority a brief discussion meeting was hold regarding the project which is implementing under the Cox's Bazaar Airport Development Project, to expand the runway of Cox's Bazaar project (2nd Stage), Radar construction etc regarding the project. In the meeting Honorable Prime Minister at the time of construction works of runway expansion of Cox's Bazaar Airport in the show places of sketch map (copy is attached) the shown land to remove the orders have been given to take necessary steps. In that situation as per the instruction of the Honorable Prime Minister to the land shown in th sketch map for taking necessary steps last dated 29/10/2017 AD Water resource Ministry is sent letters. In that situation under the Water resource Ministry Bangladesh Water Development Board to increase renew of canal and different rivers to prevent the braking of rivers and for providing a water giving facilities as per sketch map the approved necessary length the dredging works are going on. On the other hand through dredging making the renewed to make appropriate for having commute of water transportation the work segregated lands removing BIWTA or in equal any other organizations is used to be constructed. With the above mentioned construction works as there has any relation with Bapauba so in the edge of Maheshkhali channel the work to remove the shown land or through any other organizations for the purpose of implementation taking necessary steps regarding has been informed.
03. In that situation, For the appropriate implementation of the project titled "Cox's Bazaar Airport Development (1st Stage) (2nd Amended)" the land as has shown in the edge of Maheshkhali Channel in Maheshkhali as per instruction for taking necessary steps there has been requested.
As Per Description- Page No- 3
Sd/ Illegoble
Date- 03/01/2017 AD
(Jafia Afroz)
Senior Assistant Chief
Phone- 9540940
Secretary
Ministry Of Shipping
Bangladesh Secretariat, Dhaka.
1. Personal Secretary Of Honorable Minister, Ministry Of Civil Aviation And Tourism.
2. Personal Secretary of Honorable Secretary, Ministry Of Civil Aviation And Tourism.       